Operations & Performance Logistics

Fourteen depots, one way of working.

Brightway Logistics was growing volumes and shrinking margins, with each of its 14 depots working its own way. A network redesign and one operating playbook now save $21M a year.

Client: Brightway Logistics Duration: 10 months Year: 2024
The challenge

More parcels, less margin.

Brightway delivers parcels for online retailers across Malaysia and Singapore. Volumes had grown by 22% in three years, yet operating margin had almost halved, and no two depots sorted, loaded or scheduled drivers the same way.

  • +22%parcel volumes in three years
  • −48%operating margin over the same period
  • 14depots, each with its own processes

Several depots had been added through acquisitions and kept their original layouts, systems and shift patterns. Two pairs of depots served overlapping postcodes, and late-evening cut-offs meant vans often left half full.

The leadership team wanted savings that would still be there in two years, so any change had to be designed with the site managers who would run it.

Our solution

Model the network, then the depot.

A partner-led team of six worked with Brightway's COO and all 14 site managers, with savings tracked in the monthly management accounts.

  1. 01

    Redraw the network

    A network model of 2.1 million deliveries showed three depots could be consolidated without adding a single late delivery.

  2. 02

    Write one playbook

    Site managers from the best-run depots helped us write a standard playbook for sorting, loading and driver scheduling.

  3. 03

    Track every dollar

    Each saving had an owner, a baseline and a monthly report, reviewed by the COO for two years after go-live.

The results

Two years on.

Savings measured against the 2023 cost base and reported in Brightway's monthly management accounts.

$21 M Annual run-rate savings

Delivered ahead of plan and still tracked.

+6 pts On-time delivery

From 91% to 97% across the network.

3 Depots consolidated

With no customer-facing disruption.

−14 % Cost per parcel

From fuller vans and one playbook.

“The team understood our business faster than people who had worked here for years. They redesigned the network with our site managers, not around them. Two years on, the savings are still there.”
Marcus Okafor COO, Brightway Logistics